Request a quote

Home / Quality

What is checked before a valve is crated

Three rounds of checks: the material, the parts while they are made, and the finished valve.

Materials

Castings, bar and rubber are checked for composition and mechanical properties before they are machined.

Optical emission spectrometer
Optical emission spectrometerChemical composition of metals
Tensile testing
Tensile testingPreparing a specimen on the testing machine
Impact testing
Impact testingPendulum impact machine and its control unit
Metallographic microscope
Metallographic microscopeStructure of cast iron and alloys
Portable hardness tester
Portable hardness testerHardness of bodies and machined parts
Shore hardness stand
Shore hardness standHardness of rubber seats and seals

Parts in process

Machined parts are measured, and castings and welds are examined for flaws that cannot be seen from outside.

Dimensional check
Dimensional checkMeasuring a machined part with a caliper
Ultrasonic inspection
Ultrasonic inspectionExamining a large machined valve body
Penetrant inspection
Penetrant inspectionApplying penetrant to a valve component
Ultrasonic thickness gauge
Ultrasonic thickness gaugeWall thickness of castings
Handheld material analyser
Handheld material analyserChecking a part on the shop floor
Salt-spray chamber
Salt-spray chamberCorrosion testing of coatings

Finished valves

Assembled valves are tested under pressure. Flow, torque and function have their own rigs.

Large valve test bench
Large valve test benchHorizontal clamping bench behind safety barriers
Water test hall
Water test hallPipe loops, actuated valves and water tanks
Hydraulic performance facility
Hydraulic performance facilityPumps, pipe loops and valve stations
Torque and life-cycle fixture
Torque and life-cycle fixtureA butterfly valve mounted for cycling
Plastic valve pressure test
Plastic valve pressure testUnion ball valves in an automatic test machine
Balancing valve test system
Balancing valve test systemTest piping with gauges and fittings

Documents and witnessed tests

Projects ask for different paperwork. Tell us what yours requires when you enquire, and we confirm what can be supplied with the quotation.

Contact us
  • The test reports and inspection documents your project specifies
  • Any test you or your inspector want to witness at the factory
  • Third-party inspection, if your client appoints an agency
  • Marking, tagging and packing requirements

Need a valve quoted?

Send size, pressure, medium and quantity. First reply within one hour, Monday to Saturday, 08:30 to 18:00 Beijing time.

Request a quote